Safety Starts Before the Jobsite
How Pre-Planning Reduces the Risk Before Work Begins
Introduction

In industrial construction, some of the most important safety decisions are made long before a crew picks up a tool.
Who is assigned to the project? Are they trained for the work they will perform? What equipment will be required? What standards does the owner have in place? Where will crews be working? What other trades will be there? What happens when the schedule, manpower, or conditions change?
These aren’t questions that can wait until mobilization.
At United Group Services, safety planning begins before employees arrive on site and continues throughout the life of the project. It is part of estimating, staffing, training, equipment selection, fabrication, sequencing, and day-to-day project execution.
Because the earlier a risk is understood, the more options a team has to address it.
As UGS Director of Safety Keith Clay explains, the goal is to start with the big picture before getting lost in the details. Teams need to understand what is overhead, what is underground, what is in between, what crews will be exposed to, and what could create serious risk before work begins.
Safety Planning Starts with People
Pre-planning starts even earlier than the project itself.
UGS employees complete safety orientation before arriving on site, allowing them to begin the project with an understanding of UGS safety expectations. UGS is transitioning this process into its learning management system, giving employees access to training electronically and creating a consistent way to document and manage it.
But training is only part of the equation.
Before work begins, UGS considers the people being assigned to the project, their qualifications and the work they will be expected to perform. Equipment requirements, specialized PPE and client specific standards can all affect how the project needs to be staffed and prepared.
UGS standards provide the baseline. When a client’s requirements go further, the team identifies those differences before work begins so they can be accounted for in planning, equipment and cost.
That preparation matters because safety requirements can have very practical project implications. A client may require a specific type of ladder, additional PPE, specialized equipment or credentials that are not part of a typical project.
Finding that out during estimating is planning.
Finding it out after the crew arrives is a problem.
Bringing Safety into Pre-Construction

There is no single safety plan that works for every UGS project.
A relatively straightforward installation may require a very different approach than a large industrial project with multiple shifts, cranes, hundreds of workers and stringent owner requirements.
During estimating and pre-construction, the UGS team reviews available site-specific safety requirements and identifies questions, responsibilities and costs that need to be addressed. Safety personnel review documentation line by line, flag requirements that need clarification and help determine what UGS will need to provide.
As the project progresses toward award, that planning becomes more specific. The team determines whether the project requires dedicated safety personnel, begins developing its site-specific safety plan and establishes the framework for items such as emergency action planning.
The questions become increasingly practical:
How many people will be on site? Will there be multiple shifts? Could shift duration require a fatigue management plan? What equipment will be used? Will cranes be involved? Who is operating them? Are the appropriate credentials in place?
The answers influence safety, but they also influence estimating, staffing, equipment and scheduling.
That is why effective safety planning cannot happen in isolation.
Eliminate the Hazard When You Can
One of the advantages of identifying hazards early is having more choices in how they are addressed.
Sometimes the safest answer is not another rule or another piece of PPE. It is changing how the work
will be performed.
Clay uses ladder work as a simple example. If a crew needs to perform elevated work in an open area and a mobile elevated work platform is available, using the lift may eliminate the ladder exposure altogether.
That thinking requires frontline supervisors to look beyond simply asking, “Can we do this?” The better
question is: Is there a safer way to do it?
That may mean eliminating an activity, selecting different equipment, changing the sequence or coordinating with another contractor. Sometimes it is as simple as asking whether another piece of equipment already on site can be used instead.
Fabricate More in a Controlled Environment

UGS’s fabrication capabilities provide another opportunity to address risk before work reaches the field. A fabrication center offers something an active construction site cannot: control.
Crews aren’t navigating the same congestion of multiple contractors and trades. Work is indoors and largely climate controlled. Tools and workstations are established for the task. Larger piping sections can be fabricated in the shop and shipped to the project ready for field connection.
That has an obvious productivity benefit, but the safety impact goes further. Higher shop productivity can reduce the amount of work that must happen in the field. It can also help keep the overall project on schedule.
And schedule pressure matters. When a project falls behind, pressure increases. More manpower may be added. Work areas can become congested. Crews may be asked to accelerate production.
Decisions begin happening faster.
“Those are the situations where unsafe acts and incidents are more likely to occur.”
— Keith Clay
Completing more work efficiently in a controlled fabrication environment can therefore help reduce
field exposure while also protecting the schedule that crews will eventually be asked to execute.
A Safe Sequence is a Productive Sequence
Construction sequencing is often viewed primarily as a schedule issue. It is also a safety issue.
For piping work, for example, sequencing determines where crews are working, what is happening above and below them, what equipment is needed and which other trades may occupy the same space.
When the sequence works and production milestones are being met, teams have more control over the work. When the schedule slips, that changes. Resources get shifted. Manpower increases. Deadlines tighten. Pressure moves from project leadership to supervision and ultimately to the people performing the work.
Thoughtful sequencing helps prevent the project from reaching that point in the first place.
Pre-Planning Doesn’t End at Mobilization
Perhaps the most important part of UGS’s approach is that the plan isn’t considered finished once the project begins. Construction environments change constantly.
Weather causes delays. Materials arrive late. Manpower increases. A project moves from one shift to
two. Another contractor enters the work area. A phase finishes and the next begins. Each change can introduce new risks.
UGS uses weekly operations meetings to look ahead across active projects. Safety participates in those conversations, listening for changes in manpower, work areas, shifts and project phases that may require additional planning or resources.
A project with 200 people working in one area, for example, may be safer and more productive if a portion of that workforce moves to another shift. That decision then creates another series of questions: Does the second shift need additional supervision? Dedicated safety personnel? Different lighting, access or logistics?
Pre-planning becomes continuous planning.
When Trades Stack Up, Communication Matters

On a large industrial project, UGS rarely works in isolation. One contractor may be working overhead while another is below. Crews may share access routes, platforms and equipment. Work that is safe independently can create new hazards when performed simultaneously.
That requires coordination. Progress meetings help teams understand where each contractor will be working and whether activities can safely occur at the same time. If they can, additional controls such as netting or barriers may be necessary to manage dropped-object exposure and other risks.
Clay keeps a reminder of this in his office. He calls it the three C’s:
“Communication, communication, communication.”
— Keith Clay
And sometimes communicating once isn’t enough. Repeating critical information, confirming understanding and asking someone to repeat instructions back can be just as important as developing the plan itself.
Using Technology to Make Safety Easier to Execute
UGS is also working to make safety information easier for employees to access and easier for the company to manage.
Its HSI system provides a centralized location for training records, toolbox talks, checklists and other safety documentation that historically relied on paper processes. The system is designed to continue evolving as the Safety team identifies new needs and opportunities to digitize field processes.
The benefit isn’t technology for technology’s sake. It’s getting the right information into the hands of the people who need it, when they need it, whether they’re using a phone, tablet or computer.
The Goal is to Stay Ahead of the Work

Safety has changed dramatically during Clay’s more than 20 years in the industry.
Owners increasingly examine a contractor’s safety history, OSHA logs, DART and TRIR rates, EMR, health and safety programs and training practices before trusting that contractor with their work. Safety isn’t simply an internal responsibility anymore. It is part of how owners evaluate risk when choosing who they want on their projects.
At UGS, that responsibility is backed by an organization willing to invest in improvement. Clay points to something that stood out during his first year with the company: when the Safety team has identified a meaningful safety change or investment, he has yet to hear leadership simply say no.
For someone who has spent more than two decades in safety, that matters.
Because ultimately, effective safety isn’t about reacting well after something goes wrong.
It’s about asking better questions early enough that it doesn’t.
Conclusion
Look ahead. Understand the work. Identify the exposure. Put the right people, equipment and controls in place. Communicate the plan. Then keep planning as the project changes.
That is how safety starts before the jobsite.