Industrial Air Separation Unit (ASU) – “Project Summit”
Project Overview
At a major steel production facility in Osceola, Arkansas, United Group Services (UGS) delivered construction of a complex Air Separation Unit (ASU) designed to support the site’s continued expansion and operational independence. The facility now produces more than 250 tons per day of oxygen, liquid and gaseous nitrogen, and argon for steel production operations.
Known internally as “Project Summit,” the project became a defining example of collaboration, innovation, and execution under pressure. UGS partnered with ownership, engineering teams, and specialty contractors to implement a unique “One Hard Hat” methodology — an integrated project delivery approach built around shared accountability, communication, and trust.
Despite global supply chain disruptions, severe weather events, and the COVID-19 pandemic, the team completed the project safely, on time, and with virtually no rework.
The Challenge
The project involved ground-up construction of a highly technical air separation facility on a footprint of less than two acres alongside an active steel mill and existing operating gas unit.
The centerpiece of the facility — a 400,000-pound cold box standing nearly 200 feet tall — became a major scheduling challenge when global supply chain disruptions delayed shipment during the pandemic.
Additional obstacles included:
-
Material shortages impacting pipe, valves, structural steel, and control systems
-
Tropical storm-force winds and Mississippi River flooding
-
A severe winter ice storm during construction
-
Tight logistics inside an active industrial environment
-
COVID-19 mitigation and workforce protection requirements
Rather than slowing progress, the project team adapted in real time — resequencing work, redesigning lift plans, supporting commissioning efforts, and fabricating critical modular components internally when international suppliers could not deliver.
Our Solution
UGS executed the project through a collaborative hybrid delivery model combining design-assist, cost-reimbursable execution, and integrated project management. This “One Hard Hat” philosophy created a fully aligned team structure where all contractors operated under a shared safety culture, project identity, and common goals.
Strategic Planning & Collaboration
UGS coordinated all mechanical construction while managing specialty partners for civil and electrical scopes. Real-time communication systems, integrated scheduling, and cross-functional teamwork enabled rapid response to design changes and supply chain disruptions.
To maintain schedule momentum, the team:
- Resequenced work around delayed equipment deliveries
- Fabricated critical modular components internally
- Built around the cold box footprint while awaiting shipment
- Developed revised crane and lift strategies for final installation
Innovation & Technology
The project leveraged advanced planning and technology tools to improve field coordination and minimize rework:
- Integrated scheduling through Microsoft Project and Procore
- Real-time Design Error Response System for more than 160 design changes
- Portable field offices with live access to drawings and revisions
- 3D scanning and drone verification for field coordination and as-builts
- RFID tracking for workforce safety and evacuation accountability
Safety & Workforce Culture
UGS implemented extensive pandemic and safety protocols, including:
- Site-specific COVID-19 response planning
- Daily health monitoring and sanitization teams
- Three safety meetings per day
- Specialized safety training for all trades
- Cross-training and multi-skill workforce development programs
The project completed with:
- Zero recordable incidents
- Virtually no rework
- Zero on-site COVID transmission
Project Services Provided
-
Mechanical construction and installation
-
Pipe fabrication and installation
-
Structural steel installation
-
Equipment setting and rigging
-
Modular fabrication and assembly
-
Design-assist coordination
-
Project controls and integrated scheduling
-
Safety management and workforce training
-
Commissioning support
Results & Impact
Project Summit became a benchmark project for industrial collaboration and execution performance. Independent research teams from Arizona State University and the University of Kansas evaluated the project and identified measurable improvements across safety, productivity, quality, and workforce retention.
Key outcomes included:
- 20%+ productivity improvement
- 10%+ cost reduction/avoidance
- 10% reduction in project duration despite pandemic impacts
- 80% safety improvement
- Zero craft turnover
- Virtually zero rework
The completed ASU now provides critical industrial gases directly to the steel production facility, eliminating reliance on off-site supply and supporting the site’s long-term operational growth.
Client and industry feedback was overwhelmingly positive.
“It was truly the smoothest and safest built project of my 30-year career.”
People Who Made It Happen
United Group Services Project Team
UGS led project execution through integrated coordination, field leadership, and collaboration with ownership and partner contractors under the “One Hard Hat” methodology.
Key Takeaways
-
Integrated collaboration drives stronger project outcomes
-
Real-time planning and communication minimize disruption and rework
-
Workforce development and cross-training strengthen field execution
-
Strong safety culture creates measurable operational advantages
-
Prefabrication and adaptive sequencing maintain schedule certainty during disruption
About the Project
Project Summit was recognized as a groundbreaking example of collaborative industrial construction execution and was featured at the 2022 CII/CURT Conference. Independent academic research identified the project as best-in-class in safety, productivity, communication, quality, and workforce satisfaction.